End-to-end maintenance controls for the live Energy Gate Check route. The known-good Si diamond control must PASS below 5 eV/atom; the deliberately 3x-compressed, overlapping Si control must FAIL above the threshold. Both route actions completed successfully on 2026-08-02.
| Column | Range | Mean | Filled |
|---|---|---|---|
| service_id | 1 distinct | — | 100% |
| route_id | 1 distinct | — | 100% |
| action_id | 3 distinct | — | 100% |
| file_id | 2 distinct | — | 100% |
| input_label | 3 distinct | — | 100% |
| expected_gate | 2 distinct | — | 100% |
| observed_gate | 2 distinct | — | 67% |
| energy_per_atom_eV | -5.414–32.74 | 13.66 | 67% |
| threshold_eV | 5–5 | 5 | 100% |
| n_atoms | 2–16 | 9 | 67% |
| composition | 2 distinct | — | 67% |
| space_group | 2 distinct | — | 67% |
| space_group_number | 166–227 | 196.5 | 67% |
| route_status | 2 distinct | — | 100% |
| latency_s | 4.3–140.3 | 50.06 | 100% |
| notes | 3 distinct | — | 100% |