Re-read the full Resend thread in both directions and all replies on the benchmark and Apollo handoff threads.
Novikov response: No reply received from Novikov within the 48-72h window. The outbound message regarding the spin-MLIP integration contract and benchmark results remains unanswered.
CRM update: No CRM update required (no new response to log).
Benchmark thread: No new replies on the benchmark discussion. The original benchmark results (spin-MLIP vs. reference DFT on Fe, Co, Ni test structures) stand as submitted.
Apollo handoff: No new activity on the Apollo implementation handoff thread. The interface contract document remains the latest reference.
No-send: No reply from Novikov, so no follow-up message is warranted at this checkpoint.
Next checkpoint: 7-12 day cycle close (next task item).
CRM status: Outbound sent, awaiting response. No action needed until next checkpoint.
Thread timestamps confirm 48-72h window has elapsed
No new messages from Novikov or other parties
All prior deliverables (source audit, claim-to-interface map, example run, branch checkpoint, metamorphic test, route acceptance contract) remain valid and unchanged